Turnaround Time Estimates

We are usually asked about...

How long will it take to complete my design request?

These estimates are meant to be a general guide, and the final turnaround time will still be subject to the design team’s assessment. More complex requests will take more time, while simpler ones will take less time.

Bronze, Silver, Gold

General Estimates*

Deliverable(s)

Estimate*

Graphic Design: Digital

Web Banners, Digital Ads, Social Media Ads & Graphics, Posters, Email Signature Graphics, Blog Headers, Photo Editing, E-commerce Graphics, Logos, etc.

About 1 business day per 1-2 designs

Graphic Design: Printed

Signage, Packaging Labels, Stickers, Flyers/Posters, etc.

About 1 business day per 1-2 designs

Graphic Design: Multipage (Digital or Printed) or Text Heavy

Brochures, Menus, Booklets, E-books, Infographics, Web Mockups, etc.

About 1-2 business days per 1-8 pages

Graphic Design: Merchandise

T-Shirt Design, Mug Design, Packaging Design, Pattern Design, etc.

About 1-2 business days per 1-3 designs

Graphic Design: Any of the above that are of higher complexity, bulk, or both

More than 1 business day

You may ask your designer for an estimate of the project’s completion if you’d like a more accurate or specific estimate.

Illustrations:
Depends on illustration style & complexity

About 2 or more business days

A draft will be delivered after 1 business day, but completed illustrations will take at least 2 business days to complete

Motion Graphics:

Depends on complexity & length

About 1-5 business days or more

*All estimates still depend on a request’s specific complexity or bulk. Timelines may vary and are subject to the design team’s assessment.

 

⌨️ Our team works from Monday to Friday, 9 am – 6 pm EST

⏰ Cut-off Time is 4 pm EST
⌛ One-hour break within the shift

  • Requests submitted past the cut-off time of that day will not be worked on that shift, and instead will be considered for the next day.

  • Changes to your queue order/priority after the cut-off time won’t take effect until the next day.

What determines a bulky or complex request?

There are several reasons why a request would take longer than usual. The three most common reasons are bulk, complexity, and scope.

Bulk

When the total number of deliverables exceed 3-4 per request.

Examples:

  • 1 instagram post design, but 10 variations required

  • 1 web ad design, but 10 different sizes required

  • 1 workbook design, but it contains 10 pages

Even though only 1 design was requested, the total number of deliverables or output required still adds to the bulk of the request.

Complexity

When a design request has a lot of requirements, text, long instructions, or a high level of detail.

Examples:

  • 1 design only, but 10 different images need to be laid out within the design

  • 1 design only, but it needs 5 different sections and 5 paragraphs of text

  • 1 design only, but 3 completely different design options are required

  • 1-page design is requested, but each part of the request needs individual icons or graphical elements

These are just a few examples, but there are plenty of other combinations of scenarios that contribute to a request’s complexity. The more details, content, text, and graphics needed for the design, the more complex it becomes.

Didn't find the answer?